Step One: Screen the Site Before You Spend
A site either works or it does not, and the answer is usually available quickly and inexpensively if you ask in the right order.
- Utility availability and capacity: water, sanitary sewer, and the real cost and route of any extension. Capacity letters matter more than proximity.
- Drainage, detention requirements, and floodplain or floodway designation. Detention can consume a meaningful share of usable acreage.
- Access: frontage, curb cut permissions, driveway spacing, and any traffic impact requirement.
- Jurisdiction: city limits, ETJ, county, MUD, or a special district, and which rules apply to platting and construction.
- Deed restrictions, plat status, easements, pipelines, and mineral or surface rights.
- Topography, soils, wetlands, and existing structures or debris that will need removal.